Air forces are ordering. Factories deliver late.

Eighteen air forces, one question: is the surge in orders turning into combat aircraft that can fly? Official data only. Where a figure is not published, the gap is shown, not filled.

Air power. Alessandro L. Piana Bianco — updated , 9 min read. The Latest section is updated as new evidence warrants.

Figure 1 F-35 deliveries to all customers (Lockheed Martin); firm new combat aircraft ordered for US forces, November 2025 – November 2026; US F-35 fleet mission-capable rate (GAO).

01Latest · updated 16 November 2026

Order books swell. Contracts lag.

Last twelve months November 2025 – November 2026. Firm contracts only: frameworks, budget approvals and long-lead funding are listed but not counted as orders. The largest aircraft announcement of the year, 850 F-35s for the US, is a framework, not a contract; Lot 20 is still being negotiated. Firm new orders for US forces came to 27 aircraft: 22 F-15EX and 5 F-35B.

The latest record

DateAir forceEventStatus
13 Nov 2026United StatesB-21 releases weapons in test; the first operational bomber reaches Ellsworth in 2027.Builder release
12 Nov 2026United Kingdom · Italy · JapanBAE reports approximately £1.6bn of GCAP-related orders, including its share of the approximately £4.6bn Edgewing development contract.Company update; overlapping amounts, not aircraft orders
2 Nov 2026FranceThe 73rd and last Rafale of tranche 4 is delivered, five years after the order.Procurement agency
23 Oct 2026SwedenSaab’s aircraft order book reaches SEK 102.5bn, ×2.3 in a year.Company filing
22 Oct 2026United StatesF-35 framework for 850 US jets over ten years. Lot 20 is still not signed.Framework, not a contract
1 Oct 2026FinlandFirst F-35As based in Finland: 10 of 64 received.Builder release
29 Sep 2026United States22 more F-15EX ordered, $2.38bn. The Navy picks Boeing for F/A-XX.Builder release
22 Sep 2026South KoreaFirst production KF-21 delivered, three months ahead of plan.Procurement agency
18 Sep 2026GermanyFirst F-35A handed over, four years after the order.Ministry release
30 Jun 2026Ukraine16 Gripen E contracted through Sweden, SEK 24.6bn, for delivery in 2029–30.Company filing

Grade C Company-reported backlog in each firm’s own currency. Boeing Defense, Airbus Defence and Space and KAI are group or division figures that include space, weapons or civil work. The order books show where the next decade of work sits. Saab’s jump is two export deals: 17 Gripen for Colombia and 16 for Ukraine.

0×3Saab AeronauticsSaab Aeronautics: 2.29×2.29Boeing Defense (group)Boeing Defense (group): 1.32×1.32LM AeronauticsLM Aeronautics: 1.21×1.21NG AeronauticsNG Aeronautics: 1.19×1.19Dassault (defence)Dassault (defence): 1.10×1.10KAI (group)KAI (group): 1.09×1.09Airbus D&S (group)Airbus D&S (group): 1.08×1.08
Saab’s aircraft backlog leads the growth. Change in reported backlog over the latest twelve months available: Q3 2025 → Q3 2026 for Saab, Boeing, Lockheed and Northrop; end-2024 → end-2025 for Dassault and Airbus; Q1 2025 → Q1 2026 for KAI.
Data
BusinessChangeFromTo
Saab Aeronautics×2.29SEK 44.7bnSEK 102.5bn
Boeing Defense, Space & Security×1.32$76.1bn$100.5bn
Lockheed Martin Aeronautics×1.21$47.5bn$57.3bn
Northrop Grumman Aeronautics×1.19$22.5bn$26.8bn
Dassault Aviation, defence×1.10€38.2bn€41.9bn
KAI, all programmes×1.09KRW 24.3tnKRW 26.6tn
Airbus Defence and Space×1.08€46.8bn€50.8bn

02Executive summary

Executive summary

How this report is made. AI helps gather official sources and draft the charts. Every figure was read on a ministry, air force, auditor or manufacturer page, or is labelled as a state claim, a belligerent claim or another government’s assessment. — Alessandro L. Piana Bianco. Sources & methods Since 2024 air forces in Europe, Asia and the Middle East have ordered fighters in squadrons. This report asks whether those orders become aircraft, how long that takes, and whether the fleets that result are growing and able to fly.

  1. Order books swell. Firm orders do not. Saab’s aircraft backlog more than doubled in a year; Lockheed, Boeing and Northrop grew 19–32%. Yet US forces firmly ordered only 27 new combat aircraft in twelve months.×2.3Saab aircraft backlog
  2. The aircraft money sits in two US firms. Lockheed Aeronautics and Northrop Aeronautics hold $84bn of backlog, more than Dassault, Leonardo and Saab’s aircraft businesses combined ($68bn).$84bnUS aircraft backlog
  3. One jet sets the pace. Lockheed delivered 191 F-35s in 2025, four times the Rafale, F-15 and F/A-18 combined. Part of the record was jets held back since 2023; 2026 is running a third lower.94 / 143F-35s to Sep, 2026 / 2025
  4. China adds fighters. The US Air Force loses them. Japan’s ministry counts 338 more Chinese fourth- and fifth-generation fighters in three editions. The US Air Force’s fighter and attack inventory fell by 281 between FY2022 and FY2025.+338 / −281China / USAF
  5. Late at the factory, later in service. Every F-35 delivered in 2024 was late, by 238 days on average, and the combat-capable configuration is three years behind. Korea’s KF-21 is the exception: three months early.238 daysaverage F-35 lateness, 2024
  6. Fewer than half the F-35s can fly a mission. The US fleet’s mission-capable rate fell from 67% to 44% in four years. Only the US publishes such rates; France stopped with its 2024 budget and the UK withholds the percentage.44%F-35 mission-capable, FY2025

Fleet definitions differ by country (total inventory, combat-coded aircraft, aircraft in service). Counts are compared within a country over time, not added up across countries. F-35 deliveries cover all customers: the US share is not published.

03The order book

The aircraft money sits in two US firms.

Conversion ECB reference rates, 13 November 2026. Aircraft-led businesses only: Boeing Defense and Airbus Defence and Space also build satellites and weapons and are kept out. Lockheed and Northrop’s aircraft businesses hold $84bn. Dassault, Leonardo and Saab together hold $68bn. China, Russia, Japan’s builders and the Eurofighter consortium publish no combat-aircraft backlog in money.

0$60bnLM Aeronautics (US)LM Aeronautics (US): 57.3$57.3bnDassault, defence (FR)Dassault, defence (FR): 44.1$44.1bnNG Aeronautics (US)NG Aeronautics (US): 26.8$26.8bnLeonardo Aero. (IT)Leonardo Aero. (IT): 14.1$14.1bnSaab Aeronautics (SE)Saab Aeronautics (SE): 10.2$10.2bn
Combat-aircraft backlog. USD bn. Lockheed and Northrop, Q3 2026. Dassault (defence backlog) and Leonardo (aircraft and aerostructures), June 2026. Saab, Q3 2026.
Data
BusinessBacklog, $bnReported
Lockheed Martin Aeronautics57.3$57.3bn, Q3 2026
Dassault Aviation, defence44.1€39.9bn, Jun 2026
Northrop Grumman Aeronautics26.8$26.8bn, Q3 2026
Leonardo Aeronautics14.1€12.8bn, Jun 2026
Saab Aeronautics10.2SEK 102.5bn, Q3 2026

What counts Firm contracts signed for a country’s own forces. Japan’s figure is aircraft funded in the FY2026 budget. Germany’s 20 Eurofighter Tranche 5 (15 October 2025) fall just before the window. Firm orders for each country’s own forces are thin. Ukraine’s 16 Gripen, bought through Sweden, are the largest order outside the US.

030United StatesUnited States: 2727UkraineUkraine: 1616JapanJapan: 1111 fundedFranceFrance: 22
Combat aircraft ordered for own forces, last twelve months. Aircraft. US: 22 F-15EX and 5 F-35B. Ukraine: 16 Gripen E. Japan: 8 F-35A and 3 F-35B. France: 2 Rafale replacing aircraft lost in 2024. No firm order read for the other fourteen; for China and Russia, none is published.
Data
CountryAircraftWhat
United States2722 F-15EX (29 Sep 2026), 5 F-35B (31 Mar 2026)
Ukraine16Gripen E via FMV (30 Jun 2026)
Japan118 F-35A, 3 F-35B, FY2026 budget
France2Rafale, 2026

Divide the aircraft on order by last year’s deliveries and the queue appears. At the 2025 pace Sweden needs fourteen years to receive its remaining Gripen E; Dassault, eight and a half for its Rafale backlog.

015 yrsGripen E, SwedenGripen E, Sweden: 14≥ 14 yrsRafale, all buyersRafale, all buyers: 8.58.5 yrsF-35, all buyersF-35, all buyers: 1.91.9 yrs
Years to clear the order book. Aircraft on order ÷ deliveries in 2025. Gripen E: at least 56 still due to Sweden, 4 delivered in 2025. Rafale: 220 in backlog, 26 delivered. F-35: 368 in backlog, 191 delivered. A congestion signal, not a schedule.
Data
ProgrammeOn orderDelivered 2025Years
Gripen E, Sweden≥ 564≥ 14.0
Rafale, all buyers220268.5
F-35, all buyers3681911.9

04Deliveries

One jet sets the pace.

Counting rule New-build combat aircraft accepted by the customer, as counted by the manufacturer’s filings. Upgrades and remanufactured aircraft are excluded. Lockheed delivered 191 F-35s in 2025, a record. GAO found that 74 of the first 80 had been due in 2023 and 2024: the record clears a backlog of parked jets, not a new factory rate. In 2026 deliveries are running a third lower. Dassault rises every year .

F-35, all buyersF-35, all buyers 23: 989823F-35, all buyers 24: 11011024F-35, all buyers 25: 19119125F-35, all buyers 26: 949426RafaleRafale 23: 131323Rafale 24: 212124Rafale 25: 262625Rafale 26: 121226F-15, all modelsF-15, all models 23: 9923F-15, all models 24: 141424F-15, all models 25: 9925F-15, all models 26: 6626F/A-18F/A-18 23: 222223F/A-18 24: 111124F/A-18 25: 141425F/A-18 26: 7726
Deliveries per year, 2023–2026. Aircraft, same scale in each panel. 2026 (red) runs to 27 September for Lockheed and Boeing and to 30 June for Dassault. Boeing does not split US from export F-15s.
Data
YearF-35RafaleF-15F/A-18
20239813922
2024110211411
202519126914
2026 YTD941267

2026 YTD: F-35, F-15 and F/A-18 to 27 Sep; Rafale to 30 Jun.

MISSING is not zero No official delivery count was read for Italy, Spain or Israel, nor for China, Russia and Iran. Russia announces batches, never how many aircraft are in them: nine in 2025. Europe’s F-35 buyers are at very different points. Norway has all 52; Germany has received its first of 35.

0100%NorwayNorway: 52 of 5252 of 52United KingdomUnited Kingdom: 47 of 4847 of 48NetherlandsNetherlands: 52 of 5752 of 57PolandPoland: 18 of 3218 of 32FinlandFinland: 10 of 6410 of 64GermanyGermany: 1 of 351 of 35
F-35s received, share of the order. Norway (2025), UK (fleet at 1 April 2026; 48 on contract of 138 planned), Netherlands (May 2026), Poland and Finland (October 2026), Germany (September 2026). Received includes jets kept in the US for training.
Data
CountryReceivedOrderedDate
Norway52522025
United Kingdom47481 Apr 2026
Netherlands5257May 2026
Poland1832Oct 2026
Finland10641 Oct 2026
Germany13518 Sep 2026

05Fleets

China adds fighters. The US Air Force loses them.

Two sources, two definitions China: fourth- and fifth-generation fighters, Japan’s defence white papers 2023–26, compiled from the IISS Military Balance (Japan assessment). US: Air Force fighter and attack total aircraft inventory, CRS from Air Force budget documents; FY2026 is the request. On these counts China added 338 modern fighters in three editions. The US Air Force’s fighter and attack inventory fell by 281 between FY2022 and FY2025, and the FY2026 request cuts another 199.

China, 4th/5th genChina, 4th/5th gen 2023: 1,5001,5002023China, 4th/5th gen 2024: 1,5881,5882024China, 4th/5th gen 2025: 1,6681,6682025China, 4th/5th gen 2026: 1,8381,8382026USAF fighter/attackUSAF fighter/attack FY22: 2,2142,214FY22USAF fighter/attack FY25: 1,9331,933FY25USAF fighter/attack FY26r: 1,7341,734FY26r
China’s modern fighters against the US Air Force’s. Aircraft, same scale. Not comparable as forces: China’s count excludes older types, the US count includes aircraft in training and test. FY22 is the Air Force Almanac as quoted by CRS. The US DoD China report could not be read.
Data
YearChina 4th/5th genUSAF fighter/attack
2022MISSING2,214
20231,500MISSING
20241,588MISSING
20251,6681,933
20261,8381,734 (request)

US Air Force On 5 May 2026 the Air Force told Congress it has 1,098 fighters in combat-coded units, below the legal floor of 1,145. Average fighter age: 27.4 years. The UK’s combat fleet held steady as F-35s replaced Typhoons: Typhoons fell from 137 to 124, F-35Bs rose from 26 to 47. Japan grew from 324 to 344 modern fighters .

UK, TyphoonUK, Typhoon 22: 13713722UK, Typhoon 23: 13713723UK, Typhoon 24: 13713724UK, Typhoon 25: 12912925UK, Typhoon 26: 12412426UK, F-35BUK, F-35B 22: 262622UK, F-35B 23: 313123UK, F-35B 24: 353524UK, F-35B 25: 373725UK, F-35B 26: 474726
United Kingdom: combat aircraft at 1 April, 2022–2026. Total fleet, MoD equipment and formations statistics. Typhoons in service rose from 102 to 111 as the total fell.
Data
YearTyphoon, totalTyphoon, in serviceF-35B
202213710226
202313710231
202413710235
202512910737
202612411147

06Build time

Four to six years from contract to aircraft.

Ranges France publishes delivery years, not dates, so the Rafale row is a range and a plan. Poland counts to the first aircraft in the country; its first jets went to US training earlier. Wherever official dates exist, a combat aircraft takes about four to six years from contract to delivery. Korea’s KF-21, a home design built at home, took 27 months.

012243648607284Poland, F-35APoland, F-35A: 7676Germany, F-35AGermany, F-35A: 4848France, Rafale T5France, Rafale T5: 37–48, plan37–48, planUS, F-15EX Lot 3US, F-15EX Lot 3: ≈ 45≈ 45Korea, KF-21Korea, KF-21: 2727
Contract to first delivery, months. Official contract and delivery dates. Grey = range where only years are published.
Data
ProgrammeMonths
Poland, F-35A (LOA Jan 2020 → in Poland May 2026)76
Germany, F-35A (2022 → Sep 2026)about 48
France, Rafale tranche 5 (Dec 2023 → 2027, planned)37–48
US, F-15EX Lot 3 (Dec 2022 → about Sep 2026)about 45
Korea, KF-21 (Jun 2024 → Sep 2026)27

Delays are measured in years. GAO puts the F-35’s combat-capable configuration three years late and the Block 4 upgrade five. Sweden’s procurement agency says not all Gripen E due in 2025 were delivered, without saying how many.

060 moF-35 Block 4F-35 Block 4: 6060 moF-35 TR-3 combatF-35 TR-3 combat: 3636 moUK F-35, full capabilityUK F-35, full capability: 2424 moUK, first 48 F-35UK, first 48 F-35: 1616 moFrance, 2 RafaleFrance, 2 Rafale: 12≤ 12 moF-35, 2024 deliveriesF-35, 2024 deliveries: 7.8238 daysKorea, KF-21Korea, KF-21: 03 mo early
Official slip against plan. Months. GAO (F-35), National Audit Office (UK), Assemblée nationale (France), DAPA (Korea). The 2024 F-35 figure is the average lateness of each delivered jet.
Data
ProgrammeMonths late
F-35 Block 460 mo
F-35 TR-3 combat36 mo
UK F-35, full capability24 mo
UK, first 48 F-3516 mo
France, 2 Rafale≤ 12 mo
F-35, 2024 deliveries238 days
Korea, KF-213 mo early

07Readiness and age

Fewer than half the F‑35s can fly a mission.

A definition effect Mission-capable: able to fly at least one assigned mission. Fully mission-capable: all of them. The US accepted new F-35s that could not fly combat missions while the TR-3 software was late. Only the US publishes aircraft readiness, and only for the F-35: the Pentagon now withholds the other types as sensitive. France stopped publishing availability with its 2024 budget; the UK audit office says the F-35’s rates are about half and a third of target, without giving the figures.

0255075100%earlierlatestUSAF, all aircraftUSAF, all aircraft earlier 72.9%USAF, all aircraft latest 53.9%−19 ppF-35, fully capableF-35, fully capable earlier 38%F-35, fully capable latest 25%−13 ppF-35, mission-capableF-35, mission-capable earlier 67%F-35, mission-capable latest 44%−23 pp
Share of the fleet able to fly its missions. %. F-35: US fleet, FY2021 → FY2025, targets 80% and 65% by 2030 (GAO). US Air Force: whole fleet availability, 1994 → 2024 (CRS).
Data
MeasureEarlierLatest
F-35 mission-capable67% (FY2021)44% (FY2025)
F-35 fully mission-capable38% (FY2021)25% (FY2025)
USAF fleet availability72.9% (1994)53.9% (2024)

Age No other air force publishes an official average age. Germany publishes a retirement date instead: every Tornado by 2030. The US Air Force’s aircraft average 31.7 years, against 17.2 in 1994; its fighters, 27.4. The B-52s now flying were built before 1963.

08Rivals and losses

Rivals build stealth fighters. Russia keeps losing aircraft.

Labels Fleet counts: Japan’s defence white papers, compiled from the IISS Military Balance (Japan assessment). Losses: Ukraine’s General Staff (belligerent claim). Russian deliveries: state claims relayed by TASS. On Japan’s count China’s J-20 fleet more than doubled in three years; Russia’s Su-57 went from 6 to over 21.

01002003002023 edition2026 editionSu-57, RussiaSu-57, Russia 2023 edition 6Su-57, Russia 2026 edition 21+15Su-34, RussiaSu-34, Russia 2023 edition 112Su-34, Russia 2026 edition 134+22Su-35, RussiaSu-35, Russia 2023 edition 99Su-35, Russia 2026 edition 127+28J-16, ChinaJ-16, China 2023 edition 262J-16, China 2026 edition 350+88J-20, ChinaJ-20, China 2023 edition 140J-20, China 2026 edition 308+168
Rival fighter fleets, three years apart. Aircraft, Japan defence white papers 2023 and 2026 (IISS Military Balance 2023 and 2026). Su-57: “21 or more”.
Data
Type2023202420252026
J-20, China140200230308
J-16, China262292312350
Su-35, Russia99111≈ 117127
Su-34, Russia112124≈ 124134
Su-57, Russia612≈ 1921+

Ukraine’s General Staff claims 452 Russian aircraft and 356 helicopters destroyed since February 2022, 24 aircraft and 9 helicopters more than a year earlier. Russia’s ministry claims 674 Ukrainian aircraft and 284 helicopters. Neither side’s claim can be validated; Russia announced nine delivery batches in 2025 without saying how many aircraft each held.

09What is published

Disclosure follows openness.

Score Out of eight measures filled at least in part: fleet size, fleet trend, deliveries, orders, backlog, build time or slip, readiness, age. The US publishes the most, though readiness by type is now withheld. Every Finnish government site refused automated access, so Finland’s score shows what could be read, not what it publishes. China, Russia and Iran publish no orders, deliveries or fleet counts; what is known comes from other governments.

Fleet sizeFleet trendDeliveriesOrdersBacklogBuild timeReadinessAgeUnited States8/8France7/8Sweden7/8United Kingdom6/8Germany6/8Netherlands6/8Japan6/8South Korea4/8Spain4/8Italy3/8Poland3/8Ukraine3/8Israel3/8Russia3/8Norway2/8China2/8Finland1/8Iran0/8score
Which measures each air force publishes. Black = official figure; grey = partial, company-only or another government’s assessment; ring = MISSING or unreadable. Finland’s score reflects blocked sites.
Data
CountryFleet sizeFleet trendDeliveriesOrdersBacklogBuild timeReadinessAgeScore
United Statesofficialpartialpartialofficialofficialofficialofficialofficial8/8
FranceofficialpartialofficialpartialofficialofficialpartialMISSING7/8
SwedenpartialMISSINGofficialpartialofficialpartialpartialpartial7/8
United KingdomofficialofficialpartialMISSINGpartialofficialpartialMISSING6/8
GermanypartialMISSINGofficialofficialpartialofficialMISSINGpartial6/8
NetherlandsofficialpartialofficialpartialMISSINGofficialMISSINGpartial6/8
JapanofficialofficialpartialofficialpartialMISSINGMISSINGpartial6/8
South KoreaMISSINGMISSINGofficialMISSINGofficialofficialMISSINGofficial4/8
SpainpartialMISSINGMISSINGpartialpartialpartialMISSINGMISSING4/8
ItalyMISSINGMISSINGpartialpartialpartialMISSINGMISSINGMISSING3/8
PolandpartialMISSINGofficialMISSINGMISSINGofficialMISSINGMISSING3/8
UkraineMISSINGMISSINGpartialpartialMISSINGpartialMISSINGMISSING3/8
IsraelpartialMISSINGMISSINGpartialMISSINGpartialMISSINGMISSING3/8
RussiapartialpartialpartialMISSINGMISSINGMISSINGMISSINGMISSING3/8
NorwayofficialMISSINGofficialMISSINGMISSINGMISSINGMISSINGMISSING2/8
ChinapartialpartialMISSINGMISSINGMISSINGMISSINGMISSINGMISSING2/8
FinlandMISSINGMISSINGpartialMISSINGMISSINGMISSINGMISSINGMISSING1/8
IranMISSINGMISSINGMISSINGMISSINGMISSINGMISSINGMISSINGMISSING0/8

Sources & methods

Official data only.

Evidence rules. A figure counts only if it was read on an official page or PDF (ministry, air force, procurement agency, auditor, parliament) or in the manufacturer’s own release or regulated filing. News and search snippets are excluded. MISSING means no official figure could be read; it never means zero. Russian, Chinese and Iranian statements are labelled state claims; Ukraine’s and Russia’s loss figures, belligerent claims. Japan’s counts of other countries’ fleets are labelled as a Japanese assessment compiled from the IISS Military Balance. Sites that refused automated access were not worked around.

Main sources. US: GAO, CRS, USAspending (FPDS), Lockheed Martin, Boeing and Northrop Grumman filings. France: Assemblée nationale budget opinions, DGA; Dassault Aviation. UK: MoD equipment and formations statistics, National Audit Office; BAE Systems. Germany: BMVg, Bundeswehr. Italy: Leonardo. Spain: Ministry of Defence; Airbus. Netherlands: Kamerstukken, Defensie Projectenoverzicht. Norway: Forsvarsmateriell. Sweden: Armed Forces and FMV annual reports, Government; Saab. Finland: Lockheed Martin. Poland: Polska Zbrojna (MoD). Israel: Ministry of Defense. Japan: Defense white papers and budgets; MHI. South Korea: DAPA, korea.kr; KAI. China and Russia: Japan’s white papers (IISS). Russia: Rostec and UAC via TASS. Ukraine: Ministry of Defence, General Staff.

Blocked. war.gov, defense.gov, af.mil, media.defense.gov, congress.gov (HTML), cbo.gov, dote.osd.mil, the Finnish government and defence sites, gov.pl, corteconti.it, regjeringen.no, idf.il (renders empty), rostec.ru, uacrussia.ru and mil.ru (certificate errors). Figures that depend on them are MISSING.

Exchange rates. ECB reference rates, 13 November 2026: EUR 1.1052, SEK 0.0995 USD.

Cite this report

Alessandro L. Piana Bianco. Air forces are ordering. Factories deliver late.. in/out. First published . Last recorded update: .

Canonical URL: https://pianabianco.com/inout/air-power/

Disclaimer

This report was produced with the help of AI. AI agents were used to gather, cluster and integrate the data and to generate the charts and graphs. Further analysis, editorial judgement and conclusions are the author’s.

All data from publicly available sources.

All opinions expressed in this report are solely my own and do not represent the views of any current or former employer.