Figure 1 F-35 deliveries to all customers (Lockheed Martin); firm new combat aircraft ordered for US forces, November 2025 – November 2026; US F-35 fleet mission-capable rate (GAO).
191F-35s delivered in 2025, a record
27new aircraft firmly ordered, US forces
44%US F-35s mission-capable
01Latest · updated 16 November 2026
Order books swell. Contracts lag.
Last twelve months November 2025 – November 2026. Firm contracts only: frameworks, budget approvals and long-lead funding are listed but not counted as orders. The largest aircraft announcement of the year, 850 F-35s for the US, is a framework, not a contract; Lot 20 is still being negotiated. Firm new orders for US forces came to 27 aircraft: 22 F-15EX and 5 F-35B.
The latest record
| Date | Air force | Event | Status |
|---|---|---|---|
| 13 Nov 2026 | United States | B-21 releases weapons in test; the first operational bomber reaches Ellsworth in 2027. | Builder release |
| 12 Nov 2026 | United Kingdom · Italy · Japan | BAE reports approximately £1.6bn of GCAP-related orders, including its share of the approximately £4.6bn Edgewing development contract. | Company update; overlapping amounts, not aircraft orders |
| 2 Nov 2026 | France | The 73rd and last Rafale of tranche 4 is delivered, five years after the order. | Procurement agency |
| 23 Oct 2026 | Sweden | Saab’s aircraft order book reaches SEK 102.5bn, ×2.3 in a year. | Company filing |
| 22 Oct 2026 | United States | F-35 framework for 850 US jets over ten years. Lot 20 is still not signed. | Framework, not a contract |
| 1 Oct 2026 | Finland | First F-35As based in Finland: 10 of 64 received. | Builder release |
| 29 Sep 2026 | United States | 22 more F-15EX ordered, $2.38bn. The Navy picks Boeing for F/A-XX. | Builder release |
| 22 Sep 2026 | South Korea | First production KF-21 delivered, three months ahead of plan. | Procurement agency |
| 18 Sep 2026 | Germany | First F-35A handed over, four years after the order. | Ministry release |
| 30 Jun 2026 | Ukraine | 16 Gripen E contracted through Sweden, SEK 24.6bn, for delivery in 2029–30. | Company filing |
Grade C Company-reported backlog in each firm’s own currency. Boeing Defense, Airbus Defence and Space and KAI are group or division figures that include space, weapons or civil work. The order books show where the next decade of work sits. Saab’s jump is two export deals: 17 Gripen for Colombia and 16 for Ukraine.
02Executive summary
Executive summary
How this report is made. AI helps gather official sources and draft the charts. Every figure was read on a ministry, air force, auditor or manufacturer page, or is labelled as a state claim, a belligerent claim or another government’s assessment. — Alessandro L. Piana Bianco. Sources & methods Since 2024 air forces in Europe, Asia and the Middle East have ordered fighters in squadrons. This report asks whether those orders become aircraft, how long that takes, and whether the fleets that result are growing and able to fly.
- Order books swell. Firm orders do not. Saab’s aircraft backlog more than doubled in a year; Lockheed, Boeing and Northrop grew 19–32%. Yet US forces firmly ordered only 27 new combat aircraft in twelve months.×2.3Saab aircraft backlog
- The aircraft money sits in two US firms. Lockheed Aeronautics and Northrop Aeronautics hold $84bn of backlog, more than Dassault, Leonardo and Saab’s aircraft businesses combined ($68bn).$84bnUS aircraft backlog
- One jet sets the pace. Lockheed delivered 191 F-35s in 2025, four times the Rafale, F-15 and F/A-18 combined. Part of the record was jets held back since 2023; 2026 is running a third lower.94 / 143F-35s to Sep, 2026 / 2025
- China adds fighters. The US Air Force loses them. Japan’s ministry counts 338 more Chinese fourth- and fifth-generation fighters in three editions. The US Air Force’s fighter and attack inventory fell by 281 between FY2022 and FY2025.+338 / −281China / USAF
- Late at the factory, later in service. Every F-35 delivered in 2024 was late, by 238 days on average, and the combat-capable configuration is three years behind. Korea’s KF-21 is the exception: three months early.238 daysaverage F-35 lateness, 2024
- Fewer than half the F-35s can fly a mission. The US fleet’s mission-capable rate fell from 67% to 44% in four years. Only the US publishes such rates; France stopped with its 2024 budget and the UK withholds the percentage.44%F-35 mission-capable, FY2025
Fleet definitions differ by country (total inventory, combat-coded aircraft, aircraft in service). Counts are compared within a country over time, not added up across countries. F-35 deliveries cover all customers: the US share is not published.
03The order book
The aircraft money sits in two US firms.
Conversion ECB reference rates, 13 November 2026. Aircraft-led businesses only: Boeing Defense and Airbus Defence and Space also build satellites and weapons and are kept out. Lockheed and Northrop’s aircraft businesses hold $84bn. Dassault, Leonardo and Saab together hold $68bn. China, Russia, Japan’s builders and the Eurofighter consortium publish no combat-aircraft backlog in money.
What counts Firm contracts signed for a country’s own forces. Japan’s figure is aircraft funded in the FY2026 budget. Germany’s 20 Eurofighter Tranche 5 (15 October 2025) fall just before the window. Firm orders for each country’s own forces are thin. Ukraine’s 16 Gripen, bought through Sweden, are the largest order outside the US.
Divide the aircraft on order by last year’s deliveries and the queue appears. At the 2025 pace Sweden needs fourteen years to receive its remaining Gripen E; Dassault, eight and a half for its Rafale backlog.
04Deliveries
One jet sets the pace.
Counting rule New-build combat aircraft accepted by the customer, as counted by the manufacturer’s filings. Upgrades and remanufactured aircraft are excluded. Lockheed delivered 191 F-35s in 2025, a record. GAO found that 74 of the first 80 had been due in 2023 and 2024: the record clears a backlog of parked jets, not a new factory rate. In 2026 deliveries are running a third lower. Dassault rises every year .
MISSING is not zero No official delivery count was read for Italy, Spain or Israel, nor for China, Russia and Iran. Russia announces batches, never how many aircraft are in them: nine in 2025. Europe’s F-35 buyers are at very different points. Norway has all 52; Germany has received its first of 35.
05Fleets
China adds fighters. The US Air Force loses them.
Two sources, two definitions China: fourth- and fifth-generation fighters, Japan’s defence white papers 2023–26, compiled from the IISS Military Balance (Japan assessment). US: Air Force fighter and attack total aircraft inventory, CRS from Air Force budget documents; FY2026 is the request. On these counts China added 338 modern fighters in three editions. The US Air Force’s fighter and attack inventory fell by 281 between FY2022 and FY2025, and the FY2026 request cuts another 199.
US Air Force On 5 May 2026 the Air Force told Congress it has 1,098 fighters in combat-coded units, below the legal floor of 1,145. Average fighter age: 27.4 years. The UK’s combat fleet held steady as F-35s replaced Typhoons: Typhoons fell from 137 to 124, F-35Bs rose from 26 to 47. Japan grew from 324 to 344 modern fighters .
06Build time
Four to six years from contract to aircraft.
Ranges France publishes delivery years, not dates, so the Rafale row is a range and a plan. Poland counts to the first aircraft in the country; its first jets went to US training earlier. Wherever official dates exist, a combat aircraft takes about four to six years from contract to delivery. Korea’s KF-21, a home design built at home, took 27 months.
Delays are measured in years. GAO puts the F-35’s combat-capable configuration three years late and the Block 4 upgrade five. Sweden’s procurement agency says not all Gripen E due in 2025 were delivered, without saying how many.
07Readiness and age
Fewer than half the F‑35s can fly a mission.
A definition effect Mission-capable: able to fly at least one assigned mission. Fully mission-capable: all of them. The US accepted new F-35s that could not fly combat missions while the TR-3 software was late. Only the US publishes aircraft readiness, and only for the F-35: the Pentagon now withholds the other types as sensitive. France stopped publishing availability with its 2024 budget; the UK audit office says the F-35’s rates are about half and a third of target, without giving the figures.
Data
| Measure | Earlier | Latest |
|---|---|---|
| F-35 mission-capable | 67% (FY2021) | 44% (FY2025) |
| F-35 fully mission-capable | 38% (FY2021) | 25% (FY2025) |
| USAF fleet availability | 72.9% (1994) | 53.9% (2024) |
Age No other air force publishes an official average age. Germany publishes a retirement date instead: every Tornado by 2030. The US Air Force’s aircraft average 31.7 years, against 17.2 in 1994; its fighters, 27.4. The B-52s now flying were built before 1963.
08Rivals and losses
Rivals build stealth fighters. Russia keeps losing aircraft.
Labels Fleet counts: Japan’s defence white papers, compiled from the IISS Military Balance (Japan assessment). Losses: Ukraine’s General Staff (belligerent claim). Russian deliveries: state claims relayed by TASS. On Japan’s count China’s J-20 fleet more than doubled in three years; Russia’s Su-57 went from 6 to over 21.
Data
| Type | 2023 | 2024 | 2025 | 2026 |
|---|---|---|---|---|
| J-20, China | 140 | 200 | 230 | 308 |
| J-16, China | 262 | 292 | 312 | 350 |
| Su-35, Russia | 99 | 111 | ≈ 117 | 127 |
| Su-34, Russia | 112 | 124 | ≈ 124 | 134 |
| Su-57, Russia | 6 | 12 | ≈ 19 | 21+ |
Ukraine’s General Staff claims 452 Russian aircraft and 356 helicopters destroyed since February 2022, 24 aircraft and 9 helicopters more than a year earlier. Russia’s ministry claims 674 Ukrainian aircraft and 284 helicopters. Neither side’s claim can be validated; Russia announced nine delivery batches in 2025 without saying how many aircraft each held.
09What is published
Disclosure follows openness.
Score Out of eight measures filled at least in part: fleet size, fleet trend, deliveries, orders, backlog, build time or slip, readiness, age. The US publishes the most, though readiness by type is now withheld. Every Finnish government site refused automated access, so Finland’s score shows what could be read, not what it publishes. China, Russia and Iran publish no orders, deliveries or fleet counts; what is known comes from other governments.
Data
| Country | Fleet size | Fleet trend | Deliveries | Orders | Backlog | Build time | Readiness | Age | Score |
|---|---|---|---|---|---|---|---|---|---|
| United States | official | partial | partial | official | official | official | official | official | 8/8 |
| France | official | partial | official | partial | official | official | partial | MISSING | 7/8 |
| Sweden | partial | MISSING | official | partial | official | partial | partial | partial | 7/8 |
| United Kingdom | official | official | partial | MISSING | partial | official | partial | MISSING | 6/8 |
| Germany | partial | MISSING | official | official | partial | official | MISSING | partial | 6/8 |
| Netherlands | official | partial | official | partial | MISSING | official | MISSING | partial | 6/8 |
| Japan | official | official | partial | official | partial | MISSING | MISSING | partial | 6/8 |
| South Korea | MISSING | MISSING | official | MISSING | official | official | MISSING | official | 4/8 |
| Spain | partial | MISSING | MISSING | partial | partial | partial | MISSING | MISSING | 4/8 |
| Italy | MISSING | MISSING | partial | partial | partial | MISSING | MISSING | MISSING | 3/8 |
| Poland | partial | MISSING | official | MISSING | MISSING | official | MISSING | MISSING | 3/8 |
| Ukraine | MISSING | MISSING | partial | partial | MISSING | partial | MISSING | MISSING | 3/8 |
| Israel | partial | MISSING | MISSING | partial | MISSING | partial | MISSING | MISSING | 3/8 |
| Russia | partial | partial | partial | MISSING | MISSING | MISSING | MISSING | MISSING | 3/8 |
| Norway | official | MISSING | official | MISSING | MISSING | MISSING | MISSING | MISSING | 2/8 |
| China | partial | partial | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | 2/8 |
| Finland | MISSING | MISSING | partial | MISSING | MISSING | MISSING | MISSING | MISSING | 1/8 |
| Iran | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | 0/8 |
10What to watch next
Count aircraft that fly, not contracts.
The order surge is real. Whether it becomes air power depends on factories, software and maintenance.
- F-35 Lot 20. Whether the framework becomes a signed contract, and whether combat-capable TR-3 jets arrive in 2026 as GAO expects.
- Gripen E. Sweden’s 2026 deliveries, and the replacement order promised for the jets going to Ukraine.
- F-35 arrivals. Finland, Poland and Germany, all due to finish by 2029–30.
- Readiness. The next GAO figure for the F-35 fleet, the only one published anywhere.
- Rivals. The next US assessment of China, to check Japan’s count of J-20s.
Orders measure intent.
Aircraft that can fly measure power.
Sources & methods
Official data only.
Evidence rules. A figure counts only if it was read on an official page or PDF (ministry, air force, procurement agency, auditor, parliament) or in the manufacturer’s own release or regulated filing. News and search snippets are excluded. MISSING means no official figure could be read; it never means zero. Russian, Chinese and Iranian statements are labelled state claims; Ukraine’s and Russia’s loss figures, belligerent claims. Japan’s counts of other countries’ fleets are labelled as a Japanese assessment compiled from the IISS Military Balance. Sites that refused automated access were not worked around.
Main sources. US: GAO, CRS, USAspending (FPDS), Lockheed Martin, Boeing and Northrop Grumman filings. France: Assemblée nationale budget opinions, DGA; Dassault Aviation. UK: MoD equipment and formations statistics, National Audit Office; BAE Systems. Germany: BMVg, Bundeswehr. Italy: Leonardo. Spain: Ministry of Defence; Airbus. Netherlands: Kamerstukken, Defensie Projectenoverzicht. Norway: Forsvarsmateriell. Sweden: Armed Forces and FMV annual reports, Government; Saab. Finland: Lockheed Martin. Poland: Polska Zbrojna (MoD). Israel: Ministry of Defense. Japan: Defense white papers and budgets; MHI. South Korea: DAPA, korea.kr; KAI. China and Russia: Japan’s white papers (IISS). Russia: Rostec and UAC via TASS. Ukraine: Ministry of Defence, General Staff.
Blocked. war.gov, defense.gov, af.mil, media.defense.gov, congress.gov (HTML), cbo.gov, dote.osd.mil, the Finnish government and defence sites, gov.pl, corteconti.it, regjeringen.no, idf.il (renders empty), rostec.ru, uacrussia.ru and mil.ru (certificate errors). Figures that depend on them are MISSING.
Exchange rates. ECB reference rates, 13 November 2026: EUR 1.1052, SEK 0.0995 USD.
Cite this report
Alessandro L. Piana Bianco. Air forces are ordering. Factories deliver late.. in/out. First published . Last recorded update: .
Canonical URL: https://pianabianco.com/inout/air-power/
Disclaimer
This report was produced with the help of AI. AI agents were used to gather, cluster and integrate the data and to generate the charts and graphs. Further analysis, editorial judgement and conclusions are the author’s.
All data from publicly available sources.
All opinions expressed in this report are solely my own and do not represent the views of any current or former employer.