Figure 1 General Dynamics Combat Systems backlog, Q3 2025 → Q3 2026 (company filing); K2 tanks delivered to Poland under the first contract, 2022–25 (Hyundai Rotem, Polish MoD); US Army depot overhauls, FY2024 (GAO).
×1.5General Dynamics land backlog in a year
180K2 tanks to Poland, on schedule
12US Army depot overhauls in FY2024, from 1,278
01Latest · updated 16 November 2026
Order books swell. Deliveries trail.
Last twelve months November 2025 – November 2026. Firm contracts only; frameworks, approvals and budgets are listed but not counted as orders. Europe placed the year’s largest vehicle orders: 200 Puma for Germany and a PLN 60bn package for Poland. In the US the XM30 went back to prototyping and the Marines placed their last ACV order.
The latest record
| Date | Army | Event | Status |
|---|---|---|---|
| 12 Nov 2026 | United States | BAE reports approximately US$0.8bn of second-half contract funding to date to continue AMPV production. | Company market update; not vehicle deliveries |
| 10 Nov 2026 | Poland | The last K2 tanks and K9 howitzers of the year arrive. | MoD outlet |
| 5 Nov 2026 | Germany | Rheinmetall’s vehicle backlog reaches €28.7bn; the “Arminius” Boxer order slips into 2027. | Company filing |
| 30 Oct 2026 | United States | General Dynamics’ land backlog reaches $28.7bn, from $18.7bn a year earlier. | Company filing |
| 26 Oct 2026 | Netherlands | CV90 purchase sent to parliament: about €1.3bn. | Parliament letter |
| 15 Oct 2026 | United States | XM30 sent back to prototyping; one maker to be picked in June 2027. | Congressional research |
| 30 Sep 2026 | United States | Final Marine ACV contract: 32 ACV-R, $230m. | Congressional research |
| 13 Jul 2026 | United Kingdom | Challenger 3 and Ajax rated red; Ajax acceptance halted since December 2025. | Government data |
| 30 May 2026 | Poland | PLN 60bn package: 146 Borsuk, 96 Krab and 64 Rak. | MoD outlet |
| 13 May 2026 | United Kingdom | 72 RCH 155 howitzers ordered, about £1bn, first in 2028. | Ministry release |
Grade C Company-reported backlog in each firm’s own currency. General Dynamics Combat Systems and Hanwha include munitions; KNDS includes ammunition; Rheinmetall Vehicle Systems includes trucks. The order books show where the next decade of work sits. Export vehicles drove General Dynamics’ jump: $9.2bn of international awards in 2025.
02Executive summary
Executive summary
How this report is made. AI helps gather official sources and draft the charts. Every figure was read on a ministry, army, auditor or manufacturer page, or is labelled as a state claim, a belligerent claim or another government’s assessment. — Alessandro L. Piana Bianco. Sources & methods Since 2022 armies across Europe and Asia have ordered tanks, infantry vehicles and guns in the hundreds. This report asks whether those orders become vehicles, how long that takes, and whether the fleets that result are growing and ready to fight.
- Order books swell. General Dynamics’ land backlog grew 53% in a year, Rheinmetall’s vehicle backlog 45%, KNDS 41% and Patria 35%. Only Hyundai Rotem’s shrank, as it delivers Poland’s tanks.×1.5General Dynamics land backlog
- The vehicle money sits in Europe. KNDS, Rheinmetall’s vehicle division and Patria hold $72bn of backlog, two and a half times General Dynamics’ land business. Korea’s Hanwha holds KRW 34.9tn more.$72bnthree European makers
- Korea and France deliver on schedule. Poland received all 180 K2 tanks of its first contract in three years, as planned. France delivers 250–300 Scorpion vehicles a year. The US does not publish how many vehicles it receives.180 / 180K2 to Poland, on plan
- Russia empties its depots. On Japan’s count Russia’s active tanks rose from 2,070 to 3,460 in three editions, while tanks in storage fell from about 5,000 to 2,100.−2,900Russian tanks in storage
- Fast when proven, slow when new. Poland’s first K2s shipped three and a half months after the contract. New designs slip: the Polish-built K2PL by two years, the UK’s Challenger 3 and Ajax are rated red, and the US XM30 is back in prototyping.2 yrsK2PL slip
- No US Army combat vehicle met its readiness goal. GAO found none of the Army vehicles it reviewed reached 90% availability in FY2024, and mission-capable rates fell for 16 of 18 since FY2015. Europe publishes almost nothing.16 of 18vehicles with falling readiness
Vehicle definitions differ by country (tanks, armoured fighting vehicles, all land equipment). Counts are compared within a country over time, not added up across countries. Korean filings withhold unit deliveries by law; Russian releases never state batch sizes.
03The order book
The vehicle money sits in Europe.
Conversion ECB reference rates, 13 November 2026. Korean backlogs are reported in won and not converted. BAE’s vehicle business does not report a separate quarterly backlog. Three European makers hold $72bn, two and a half times General Dynamics’ land business. Hanwha’s defence backlog, KRW 34.9tn, is mostly exports: Poland, Australia, Egypt, Romania and Norway.
What counts Firm contracts for a country’s own forces with a stated quantity. Japan’s figure is vehicles funded in the FY2026 budget. US orders are mostly published as dollar values without quantities: $536m of M109A7 howitzers, $1.1bn of HIMARS, $598m of Abrams changes. Poland and Germany placed the largest orders. Finland’s 112 K9 howitzers were bought government to government from Korea.
Korea is the year’s exporter. Hanwha signed rocket-artillery deals with Poland, Norway, Croatia and Estonia, and sold 112 K9 howitzers to Finland.
04Deliveries
Korea and France deliver on schedule.
Counting rule New or rebuilt combat vehicles handed to the customer, as stated by the ministry or the maker. Korean filings report value delivered, never units. Poland received the first K2s three and a half months after signing and all 180 by end-2025, as planned; at least 46 more arrived in 2026. France delivers the Scorpion family at a steady pace, though Griffon and Serval slowed in 2026.
Data
| Vehicle | 2025 | 2026 |
|---|---|---|
| Griffon | 150 | 122 |
| Serval | 103 | 70 |
| Jaguar | 33 | 33 |
| Leclerc XLR | 21 | 21 |
| Griffon MEPAC | 10 | 20 |
MISSING is not zero No annual delivery count was read for the US, Germany, Italy, Israel, South Korea’s own army, China or Iran. The UK has confirmed no production Challenger 3. Russia announces batches, never their size. New tanks for Europe’s armies are only starting to arrive. Norway has two of its 54 Leopard 2A8; Germany and Sweden expect theirs from 2027.
05Fleets
Russia empties its depots.
Japan’s count Japan’s defence white papers 2023–26, compiled from the IISS Military Balance (Japan assessment). Values are approximate. Storage = total including storage minus active. Russia’s active tank fleet grew by 1,390 in three editions while its stored tanks fell by about 2,900: the depots are being emptied to replace losses. China’s count has not changed at about 5,950.
UK MoD Equipment and formations statistics at 1 April. The 2025 edition widened the scope, so changes across 2024–25 are not all real. AS90 howitzers went to Ukraine; 14 Archer are the interim. The UK is swapping old for new more slowly than it retires. Warrior fell from 721 to 526 in four years and every AS90 is gone, while Ajax rose to 185 before acceptance stopped. France’s Griffon fleet grew from 573 to 883 as VAB fell from 2,005 to 1,509.
06Build time
Fast when proven, slow when new.
Plans and actuals Rows marked plan count to the first delivery announced at contract. Poland counts to the first shipment; France’s CAESAR figure is the ministry’s order-to-delivery time. A vehicle already in production can arrive in months: Poland’s K2s shipped three and a half months after signing, and France halved CAESAR’s lead time. New European tanks and infantry vehicles take two to four years from order to first delivery.
New designs slip by years. Poland’s locally built K2PL moved from 2026 to 2028. The UK rates Challenger 3 and Ajax red and Boxer amber, with Boxer’s budget cut from £7.0bn to £5.2bn. The US cancelled the M10 Booker after 26 of 38 vehicles and sent the XM30 back to prototyping.
07Readiness and age
No US Army combat vehicle met its readiness goal.
GAO-25-108679 September 2025. Per-vehicle rates are in the full report only, which could not be read. The Army’s availability goal is 90%. GAO found that none of the Army vehicles it reviewed met the 90% goal in FY2024, that five of six combat vehicles missed their mission-capable goals every year since FY2015, and that rates fell for 16 of 18 Army and Marine vehicles. Depot overhauls nearly stopped.
Data
| Service | FY2015 | FY2024 |
|---|---|---|
| Army | 1,278 | 12 |
| Marine Corps | 725 | 163 |
Europe France gives only the change: Army equipment availability +1.3 points in 2026. Germany has classified its readiness report since 2019. The UK, the Netherlands and Italy publish nothing. The fleets are old. The Bradley has served since 1981 and the US still runs about 2,900 M113s awaiting replacement. France retires the Leclerc from 2037; Germany keeps the Marder until at least 2030.
08Rivals and losses
Claimed losses outrun any factory.
Labels Ukraine’s General Staff and Russia’s Ministry of Defence, cumulative claims, mid-November 2025 → mid-November 2026 (belligerent claims). Neither can be validated. Each side claims to have destroyed more armour in a year than any Western army owns. Ukraine’s claimed artillery count rose by almost 18,000, against 1,128 tanks, which suggests a change in what is counted; it is left out.
Russia’s own claims are the only production figures it gives: 1,530 new and upgraded tanks and over 2,500 infantry vehicles in 2023, and armour deliveries “doubled” in 2025. Every batch release since omits the number of vehicles.
09What is published
Disclosure follows openness.
Score Out of eight measures filled at least in part: fleet size, fleet trend, deliveries, orders, backlog, build time or slip, readiness, age. France publishes the most, down to vehicles delivered by type each year. The US publishes readiness through its auditor but no delivery counts. Korea’s makers report money, not vehicles. China, Russia and Iran publish no orders or fleet counts.
Data
| Country | Fleet size | Fleet trend | Deliveries | Orders | Backlog | Build time | Readiness | Age | Score |
|---|---|---|---|---|---|---|---|---|---|
| France | official | official | official | official | official | official | partial | partial | 8/8 |
| United States | partial | MISSING | partial | official | official | official | official | partial | 7/8 |
| United Kingdom | official | official | partial | official | partial | official | MISSING | partial | 7/8 |
| Germany | partial | MISSING | partial | official | official | official | MISSING | partial | 6/8 |
| Japan | official | official | partial | official | MISSING | MISSING | MISSING | partial | 5/8 |
| Netherlands | partial | MISSING | partial | official | MISSING | official | MISSING | official | 5/8 |
| South Korea | MISSING | MISSING | partial | official | official | partial | MISSING | MISSING | 4/8 |
| Poland | partial | MISSING | official | official | MISSING | official | MISSING | MISSING | 4/8 |
| Norway | partial | MISSING | official | official | MISSING | official | MISSING | MISSING | 4/8 |
| Sweden | partial | MISSING | official | partial | MISSING | official | MISSING | MISSING | 4/8 |
| Italy | MISSING | MISSING | partial | partial | partial | partial | MISSING | MISSING | 4/8 |
| Russia | partial | partial | partial | MISSING | MISSING | MISSING | MISSING | MISSING | 3/8 |
| Spain | MISSING | MISSING | official | official | MISSING | MISSING | MISSING | MISSING | 2/8 |
| Finland | MISSING | MISSING | MISSING | partial | partial | MISSING | MISSING | MISSING | 2/8 |
| Israel | MISSING | MISSING | partial | partial | MISSING | MISSING | MISSING | MISSING | 2/8 |
| China | partial | partial | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | 2/8 |
| Ukraine | MISSING | MISSING | partial | MISSING | MISSING | MISSING | MISSING | MISSING | 1/8 |
| Iran | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | MISSING | 0/8 |
10What to watch next
Count vehicles that can fight, not contracts.
The order surge is real. Whether it becomes land power depends on factories, new designs and maintenance.
- Poland. Whether K2PL production starts in 2028, and the third K9 contract.
- United Kingdom. Whether Ajax acceptance resumes and the first production Challenger 3 is handed over.
- New European tanks. Germany’s and Sweden’s first Leopard 2A8s in 2027; Germany’s new Puma in 2028.
- United States. The XM30 choice in June 2027 and whether the M1E3 reaches units within 30 months.
- Russia. The next count of tanks in storage, to see when the depots run dry.
Orders measure intent.
Armour that can move measures power.
Sources & methods
Official data only.
Evidence rules. A figure counts only if it was read on an official page or PDF (ministry, army, procurement agency, auditor, parliament) or in the manufacturer’s own release or regulated filing. News and search snippets are excluded. MISSING means no official figure could be read; it never means zero. Russian, Chinese and Iranian statements are labelled state claims; Ukraine’s and Russia’s loss figures, belligerent claims. Japan’s counts of other countries’ forces are labelled as a Japanese assessment compiled from the IISS Military Balance. Sites that refused automated access were not worked around.
Main sources. US: GAO, CRS, USAspending (FPDS), Army; General Dynamics, BAE Systems, Lockheed Martin filings. France: Assemblée nationale budget opinions, Chiffres clés de la défense, Ministry of the Armed Forces; KNDS. UK: MoD equipment and formations statistics, NISTA major projects data, Defence Investment Plan. Germany: BMVg, Bundeswehr, Rüstungsbericht; Rheinmetall. Italy: Leonardo, Camera dei deputati. Spain: Ministry of Defence, La Moncloa. Netherlands: Kamerstukken, Defensie Projectenoverzicht. Norway: Forsvarsmateriell. Sweden: Armed Forces annual report, Government. Finland: Patria. Poland: Polska Zbrojna (MoD), NIK; Hyundai Rotem, HSW. Israel: Ministry of Defense. Japan: Defense white papers and budgets. South Korea: DAPA via korea.kr; Hanwha Aerospace and Hyundai Rotem filings (DART). China and Russia: Japan’s white papers (IISS). Russia: Ministry of Defence, UVZ and other makers via TASS. Ukraine: Ministry of Defence, General Staff.
Blocked. asafm.army.mil (Army budget books), comptroller.defense.gov, dsca.mil, GAO full-report downloads, media.defense.gov, parliament.uk, rbsl.com, difesa.it, corteconti.it, regjeringen.no, investors.baesystems.com, the Finnish government and defence sites, gov.pl, fmv.se news pages, dapa.go.kr, rostec.ru and uvz.ru. Figures that depend on them are MISSING.
Exchange rates. ECB reference rates, 13 November 2026: EUR 1.1052 USD.
Cite this report
Alessandro L. Piana Bianco. Armies are ordering. Armour arrives slowly.. in/out. First published . Last recorded update: .
Canonical URL: https://pianabianco.com/inout/land-power/
Disclaimer
This report was produced with the help of AI. AI agents were used to gather, cluster and integrate the data and to generate the charts and graphs. Further analysis, editorial judgement and conclusions are the author’s.
All data from publicly available sources.
All opinions expressed in this report are solely my own and do not represent the views of any current or former employer.